Copyright © 2009-2013 ProMIS Ltd.  |  All Rights Reserved  |  Terms of Use
Company
Reference Person
Power Year HEPP Works Done Turbine/Generator
Manufacturer
Bereket Enerji 35 MW 1999 Dalaman
I-II-III-IV-V
SCADA/Automation
Commissioning
China/Germany
Maraş Enerji
Emrah Uygar
2 x 4.8 MW 2009 Firnis Electrical Cabling
SCADA/Automation
Commissioning
Norway/Spain
Yenigün Enerji
Celal Çıtak
2 x 3.2 MW 2010 Posof III EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning
Austria/Poland
Gürüz Enerji
Ersin Taşkapıoğlu
1 x 1.1 MW
1 x 0.45 MW
2010 Tuztaşı EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning
China/China
Essentium Enerji
Hüseyin Çelik
1 x 8.5 MW
1 x 5.25 MW
2011 Merekler EM Mounting
Switchgear Design/Application
Commissioning
Austria/Spain
Uslu Enerji
Metin Uslu

2 x 8.05 MW
1 x 4.05 MW
2011 SAF I EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning
China/China
Peker Enerji
Eren Kent
2 x 4.6 MW
1 x 1.9 MW
2011 Serge EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning
China/China
Peker Enerji
Eren Kent
2 x 3.4 MW
1 x 1.36 MW
2011 Tuzlaköy EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning
China/China
Üründül Enerji 2 x 6.9 MW
1 x 2.75 MW
2011 Yeşilırmak EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning
China/China
Yüksel Yapı
Oğuz Berkol
2 x 7.65 MW
1 x 3.3 MW
2012 Çobanlı EM Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning
China/China
Eksen İnşaat
Çağrı Velidedeoğlu
1.6 MW 2013 Koçak 2 EM Mounting
Switchgear Design/Application
Commissioning

Austria/Austria
Savaş Yalkın 1 x 6 MW
1 x 1.4 MW
Horizontal
Francis
2013 Yazılı Electrical Mounting
SCADA/Automation
Switchgear Design/Application
Commissioning
Austria/Austria
Sur Yapı
Hasan Paçal

7 MW 2013 Aksu Mechanical Mounting
Pelton Vertical Turbine
Consultancy
Norway/Spain
Akfen
İrfan Erciyas

125 GW 2013 Karasu
(5 HEPP)

Sales of 5 HEPP, owned by Akfen, to a German funding company is organized by ProMIS. -
Enera A.Ş. 3.77 MW 2014 Arpacık Equipment Procurement/Electromechanical Installation Supervision Italy/Italy
Tek-en Enerji Üretim
A.Ş.
17,3 MW 2014 Göksu Electrical Automation Procurement & Installation Works/154KV Switchyard Equipment Procurement & Installation Austria/Austria
77 Construction 53 MW 2014 Kajhaki Unit 2 Electromechanical Procurement & Installation Works/Automation/Rehabilitation China/China

Energy

The activities in the field of energy which ProMIS has been carrying out since 1999 focus on the establishment of turn-key Hydro Electric Power Plants (HEPP); several projects of different capacities have been successfully put into use.

Having carefully examined the performance factors of HEPP projects which have become very popular especially in recent years, ProMIS has determined its line to be only designing and putting into use turn-key projects. ProMIS, which believes that all responsibilities should be brought together under the roof of a single company for high-quality and high-performance projects, does not prefer to be involved in HEPP projects as a contractor although it has specialized in automation and electricity projects.

Having strengthened its profound knowledge in industrial automation with the skills developed in hydroelectric power plants in the course of time, ProMIS has determined the capacity of its experienced and qualified engineering team to be 5-6 HEPP projects in a year for the purpose of making no concessions on quality and performance. ProMIS Energy Group designs and supplies all of the following main components of a HEPP.

The activities of ProMIS Energy Group have been transferred to ProMIS Energy Ltd., which was established in 2008, and the energy projects were started to be carried out under the roof of a separate company. After the leave of Murat Yetis from the company partnership in the first half of 2011, the partners of PCS (www.pcs.com.tr) company Ugur Yigit and Tahir Batur joined to ProMIS Energy as company partners in May 2011.

ProMIS Energy, is designing and supplying all of the main components of a HEPP as mentioned below.

        Hydraulic Turbines  |  Generators and Electrical Installation  |  Hydro-Mechanical Systems
        Generator and Turbine Regulators  |  Pressure Sets  |  Lubrication, Drainage and Cooling Systems
        Automation Units  |  Remote Control and Maintenance Systems


In new projects, optimum installation dimensions are analyzed and fixed investment cost is determined following feasibility and profitability studies. Fixed-price system offer which is provided in accordance with turn-key basis includes project management, basic and detailed engineering and the supply-installation-start-up of all devices and installations.
References
@